This report, launched at the Annual General Meeting of Civic Voice on 21st November 2026, highlights how the planning system in England is notoriously complex and says reforms over the past two years have increased this complexity for all involved. To help communities navigate these challenges, Civic Voice has prepared a guide to the workings of the planning system, with an emphasis on the housing aspects of planning. The underlying values reflect the charity’s mission to champion communities and promote sustainable, socially inclusive and well-managed places.
Welcoming the launch of Civic Voice’s report, “Building the Future: The Role of Civic Societies in Housing and Community Planning,” Griff Rhys Jones (President of Civic Voice) emphasised the essential role that local community involvement plays in shaping the places where people live. “We have different problems in different places, and the acknowledgement of those different problems is partly down to the involvement of the people who are on the ground and who know what’s happening and what the concerns are,” he said. “The report shows the importance of local involvement in decisions that affect people who take pride in their community and surroundings. Civic Voice calls on all levels of government to recognise the legitimate role of civic societies in seeking to influence plan preparation and decision-making.”
The report’s convener, Professor Barry Goodchild, says “A particular strength of civic societies and amenity groups is their local knowledge of previous schemes, of local conditions, local concerns and of heritage. Yet the role of civic societies and the justification for their continued involvement in planning and other local affairs go beyond the provision of information. Civic societies, like other civil society organisations, enrich democratic decision-making and help increase the accountability of government.”
While supporting government policies to increase annual housebuilding rates, Civic Voice warns that increasing housing supply alone has limited impact on affordability. It stresses that direct support for low-income housing is essential. Civic societies should therefore support local proposals for affordable and social rent housing. In addition, they should press local authorities to allocate sites for smaller developers and self-build schemes that will provide a greater variety of output and that offer a greater degree of community control.
Housing should not be provided in isolation, says the charity. It must be considered and planned together with employment opportunities, the local environment and the relevant infrastructure requirements, including GP surgeries and schools.
It is therefore legitimate for civic societies to ask questions that go beyond ‘how many homes?’ in each area to assess the community and environmental impact. Raising questions about impact is not obstructive, says Civic Voice. It is a reflection of the active involvement of people who care about their neighbourhood, their village, their town or city.
Civic Voice is encouraging local groups to engage in plan and strategy preparation, to press local authorities to explain and clarify any statements that they do not understand and to insist that authorities use non-technical language in their explanation. The need for clear communication has been sorely ignored in recent discussions of planning policy. We’ll be sending more information to member societies on how to apply the findings of the report when trying to influence planning decisions and acting as a “positive if critical friend” to your council.
Minutes of a meeting held on Wednesday 11th November 2026, at 8.00 p. m., at the Chapter House, Southover Church.
Present: Roger Maskew, (in the Chair), Will Dorman, John Gower, Julian Till, Andrew Winter and Carolyn Beckingham.
1. Apologies for Absence:
Apologies for absence were received from Charles Meloy, Luke Bray and Alex Durn.
2. Minutes of Previous Meeting:
The minutes of the meeting held on 14th October were approved with the following amendment: The discussion on the planning application for The Fosse had been omitted.
3. Executive Committee:
There was a meeting of the Executive Committee on the 28th October 2026.
Key Matters discussed:
(a) The meeting with Bob Cottrill, (CEO of Lewes District / Eastbourne Borough Councils), on the 21st October, included discussion on the FoL Flood Policy and issue of Ham Lane discharges. LDC’s opposition to North Barnes / Eton Mess development. Confirmation that the Lewes TIC will open at the Barbican on 10th November.
(b) There was support from the Committee for our objection to the current LIDL proposals on land East of Brooks Road.
(c) Peter Earl reported had attended a meeting on the previous evening and reported on the progress of the Lewes Town Plan, which is to be considered again at a further on the 12th November, with a final meeting to take place on the 10th December.
(d) In AOB, Bronagh Liddicoat reported on the Mayor’s Working Party on Vitality of High Street, with a list of issues that had been discussed, including the refurbishment of the street furniture in the precinct.
4. Flood Report – This will be in the Friends of Lewes Winter Newsletter
5. Decisions:
The following SDNPA decisions are available online:
SDNP/26/02547/DCOND: Old Malling Farm, Old Malling Way. Discharge of condition 27 (Southeast NMU Access) in relation to SDNP/18/06103/OUT. Approved.
SDNP/26/03627/LDP: 7 The Fosse, Lancaster Street. Installation of solar panels to roof. Approved.
6. New Planning Applications:
11th October to 6th November
SDNP/26/04024/HOUS: 4 Bear Yard: Conversion and extension of existing dilapidated single storey structure to provide two storey short term residential accommodation.
The Friends of Lewes object to this planning application for the following reasons:-
(1) The site is located within flood zone 3, where all residential accommodation at ground floor level should not be supported, although it is noted that this proposal is only for short term residential use.
(2) The proposed front elevation of the proposed two storey building is considered to be rather fussy, and would immediately abut the existing Harveys Tavern, which is a listed building. As such, the Society does not agree with some of the conclusions in the submitted “Design and Access Statement”.
(3) The Society notes that the proposed side elevation is a combination of contrasting brickwork and slate tile hanging, and suggests that it would be appropriate to continue this same approach to the front elevation of the new residential accommodation. Such an approach would not only result in the appearance of the new build contrasting with the existing listed building, but it would also be a benefit when viewing the new building within its wider setting.
SDNP/26/04138/LIS: Market Tower, Market Street: Installation of new water main connection to replace existing supply route.
The Friends of Lewes support this application, and fully endorse the recommendation of the Conservation Officer on the installation of the new water main connection, that will result in the minimum environmental impact.
SDNP/26/04241/FUL: Unit 5 Brooks Road: Proposed change of use comprising retail sales (Class E a), storage and distribution (Class B8), online retail operations and associated office accommodation, in connection with charitable retail activities.
The Friends of Lewes support this application to re-use the former Homebase warehouse, and the necessary change of use that would ensure that this currently vacant industrial unit is fully utilised.
The Committee examined the following applications and had no observations to make:
The Committee examined the following applications and had no comments to make:
(a) On Wednesday 18th November, (7.30 to 9.00), an online talk by Peter Earl, entitled “Planning in Lewes”, (£4 for non-members).
(b) On Saturday 21st November, (10.30 to 12.30), a Fol Coffee Morning at Southover Church Hall in St. James Street, open to all. RSVP by 15th Nov. to membership@friend-of-lewes.org.uk
8. Date of Next Meeting:
Wednesday 2nd December 2026, at 8.00 p. m., at the Chapter House.
Minutes of a meeting held on Wednesday 14th October 2026, at 8.00 p. m., at the Chapter House, Southover Church.
Present: Roger Maskew, (in the Chair), Will Dorman, John Gower, Luke Bray, Julian Till, Andrew Winter and Carolyn Beckingham.
1. Apologies for Absence:
Apologies for absence were received from Charles Meloy and Alex Durn.
2. Minutes of Previous Meeting:
The minutes of the meeting held on 09th September 2026 were approved.
3. Executive Committee:
Key items discussed:
(a) A meeting with Rob Cottrill, (CEO of Lewes District / Eastbourne Borough Councils), to be
held on the 21st October.
(b) There was strong support from the Committee for our objection to the current proposals for the redevelopment of Eastgate Wharf, and it was agreed that the site should be part of a Masterplan for the centre of Lewes, including a suitable replacement of the former bus station site.
(c) Adrian Ross informed the meeting that the Tourist Information Centre is proposed to be located in the Barbican, but that the Town Council was still pushing for it to be in 187 High Street.
(d) The Committee was advised that the Town Council’s Flood Report of the 2000 floods in Lewes is going to be distributed at an evening event planned for the 30th October in the Council Chamber. (Which was attended by Roger, Peter Earl and Bronagh Liddicoat).
(e) In order to commemorate 75 years of the Friends of Lewes in 2027, a programme of events is currently being considered by the Membership Committee.
4. Flood Report
The 12th October marked the 26th anniversary of the 2000 Lewes Floods, when 613 homes and more than 200 businesses were devastated, and more than 200 businesses were devastated, and 186 people had to sleep for several nights in emergency accommodation at the Town Hall and the Malling Community and Leisure Centres.
Lewes Town Council has recently published a report on the events of last autumn, when the 25th flood anniversary was marked with a very well attended flood conference, public meeting and Friends of Lewes exhibition of photographs and flood memories. The report covers the history of flooding in Lewes, discussions on the technical preparedness and flood response and the way forward. The FoL new policy against development in the flood plain is also featured. Aviva Insurance has warned that many homes being built in England could become uninsurable in the future because they are located in flood-risk areas. Read the Guardian report here. This warning has implications for the proposed developments at North Street, Eastgate Wharf and the former Bus Station in Lewes if they proceed as currently planned. Homes that cannot be insured may become unmortgageable and suffer a significant loss in value.
A community group, “Let’s Get Ready Lewes”, is preparing a guide to help residents prepare for and cope with emergencies caused by the climate crisis. FoL has been invited to contribute, particularly by strengthening the sections on flood risk. The proposed North Barnes development, dubbed the ‘Eton Mess’, between Plumpton and East Chiltington, would bring 3,250 new homes to the area. The proposal involves sending the resulting sewage to Lewes for treatment. This raises serious concerns about the capacity of the existing sewage infrastructure, including the Ham Lane pumping station, and the risk of increased discharges of untreated sewage directly into the River Ouse.
Although North Barnes is several miles from Lewes, this proposal highlights the importance of monitoring major developments throughout the River Ouse catchment.
Development upstream can have significant implications for Lewes, both in terms of flood risk, sewage and water quality and the capacity of essential infrastructure.
5. Decisions:
The following SDNPA decisions are available online:
SDNP/26/03583/FUL: Land East of Brooks Road: Demolition of existing buildings and redevelopment to provide Class E foodstore with ancillary parking, access and landscaping.
The Friends of Lewes object to this proposal for the following reasons:-
(1) This application must be considered against the new policies in the National Planning Policy Framework and the changes to the South Downs Local Plan, as well as the emerging Lewes Masterplan which will influence the Lewes Neighbourhood Plan.
(2) The loss of employment land is unacceptable and contrary to development plan policies including Lewes Neighbourhood Plan Policy HC4.
(3) Given the current high number of vacant shops in Lewes Town Centre, it is considered essential that an impact assessment be submitted in support of this application, which would need to show that this development would not have a significant adverse impact on the existing shopping environment, and to indicate how it will maintain or enhance town centre viability.
(4) It is unclear why Lidl has chosen to place their store in an active flood plain and to locate their convenience store adjacent to a newly enlarged Aldi, Tesco and Waitrose. In times of flood the food security of the town would be under threat, which conflicts with National Planning Policy Framework, which states that development should be steered to the lowest to areas with the lowest risk of flooding.
(5) This proposal would focus all shopping related traffic movements onto a single part of the town’s road system, which would be undesirable and raises both highway capacity and safety issues. Furthermore, this application does not fit well with the emerging development of the town with the focus on modal shift and large increases in cyclists from the Phoenix and Old Malling Farm housing areas.
(6) As a large proportion of the site will effectively be sealed by the proposed building and tarmac, it would be essential that a porous surface be provided with provision for adequate storm attenuation measures to be accommodated. However, this might be difficult to achieve as the water table is frequently very high on the proposed development site.
(7) In sustainability terms, the proposals do not make any use of the existing buildings on the site, which are relatively new and should be repurposed in order to save the embodied carbon. Furthermore, with land at a premium, it seems short-sighted that only a single storey development is being proposed.
(8) Given the important location of this site as the “gateway to the historic town of Lewes”, the proposed building lacks architectural merit, being sited adjacent to the conservation area and a grade 1 listed building, the Jireh Chapel. As such, the proposals are contrary to both SDLP Strategic Policy SD12 Historic Environment, and Strategic Policy SD25 Development Strategy, and effectively demonstrate that this is site is unsuitable for the construction of a large Class E foodstore.
SDNP/26/03435/FUL: Erection of 12 floodlights to existing tennis courts.
The Friends of Lewes are concerned that the introduction of these floodlights must comply with the Southdown Downs National Park’s Policy on Dark Skies.
SDNP/26/03642/HOUS & 03643/LIS: 59 Southover High Street: Installation of2no linked dormer windows and 2no rooflights to rear roof, creation of internal ensuite shower room.
The Friends of Lewes object to the introduction of one large linked dormer to the rear roof. Of particular concern is the introduction a vertical panel in order to link the two proposed dormer windows. In this respect, the Society considers it this would be visually difficult to achieve using vertically matching roof tiles.
SDNP/26/03869/HOUS: 8 Queen Annes Close: Loft conversion including new dormer with Juliet balcony to rear roofslope and 2no rooflights to front roofslope.
The Friends of Lewes object to this proposal as it does not comply with the agreed policy regarding the introduction of a new dormer within an existing roof, and would result in a bulky structure close to the existing ridge. Furthermore, although this elevation has been described as the “Proposed Rear (South East) Elevation” it would be clearly visible from the public realm in Prince Edward’s Road.
The Committee examined the following applications and had no observations to make:
Minutes of a meeting held on Wednesday 9th September 2026, at 8.00 p. m., at the Chapter House, Southover Church.
Present: Roger Maskew, (in the Chair), John Gower, Charles Meloy, Luke Bray, Julian Till, Andrew Winter.
1. Apologies for Absence:
Apologies were received from Will Dorman, Alex Durn and Carolyn Beckingham.
2. Minutes of Previous Meeting:
The minutes of the meeting held on 05th August that had been circulated were approved, but will need to be amended. Please see “Responses to August Planning Applications”, dated the 16th August, when comments on the amendments to 3 conditions on the proposed Old Malling Farm development were not able to be submitted, and have subsequently all been approved.
3. Executive Committee:
There had been no Executive Committee meeting in August.
4. Decisions:
1st August to 28th August
The following SDNPA decisions are available online:
SDNP/25/01671/FUL: Eastgate Wharf Lewes East Sussex BN7 2LD. (Amended Scheme).Demolition of existing buildings and construction of mixed-use development comprising 60 dwellings (Class C3), and 372sqm ground floor commercial space (Class E), with associated flood defences, landscaping, parking, access alterations, and public realm (amended scheme).
The Friends of Lewes object to this planning application for the following reasons:-
(1) It is contrary to the Society’s recently issued “Policy on Development in the Floodplain”, which specifically recommends that there should be no future housing development on the floodplain in Lewes.
(2) Furthermore, the Society considers that this Eastgate Wharf site has a strategic importance in seeking to achieve an appropriate integrated town centre re-development, in order to ensure the future vitality of Lewes Town Centre.
(3) In this respect, the Society would strongly recommend that this current proposal should not be supported.
(4) Taking a wider, more strategic view, given that both the Generator Group’s proposal for the redevelopment of the former Lewes Bus Station Site, and Human Nature’s proposals of for the redevelopment of the former Phoenix Iron Works Site, do not seem to be making any progress, the Society would strongly recommend that it is timely to consider that a “Masterplan” should be prepared for the centre of Lewes.
(5) Indeed, it is understood that the SDNPA has already invited the Lewes Planning Group to contribute to such a review.
(6) Such a “Masterplan” should take the opportunity to consider the provision of an alternative option for replacing the bus facilities in the centre of Lewes, including the provision of bus stops at save locations, adequate space for buses to stop for limited periods, and the provision of facilities for bus crews to take a break.
(7) Simultaneously, Southern Water should be strongly encouraged to improve the capacity of the waste water treatment works in Ham Lane, before any further housing is built in Lewes, in order to avoid any additional discharges of untreated water into the River Ouse.
SDNP/26/03177/HOUS: 7 the Fosse Lancaster Street:
Installation of five all-black solar PV panels inset into the south facing roof.
The Friends of Lewes object to this planning application, as solar panels should not be installed on an elevation facing the street within a Conservation Area, due to the adverse visual impact on the historic setting. Not submitted as planning application had been withdrawn.
Friends of Lewes continue to object to this proposal because insufficient evidence has beenprovided to demonstrate that the development will not increase surface-water runoff within the River Ouse catchment.
This is a fundamental issue because any increase in runoff from the development would add to flows within the River Ouse and could consequently increase the risk of flooding in Lewes and other areas downstream.
We note that both the Environment Agency and the East Sussex County Council Flood Risk Management Team continue to object to the proposal on grounds relating to flood risk and the buildability and effectiveness of the proposed Surface Water Management System. In particular, it has not yet been satisfactorily demonstrated that the system can prevent any increase in surface-water runoff from the developed site.
Friends of Lewes consider that this issue must be resolved before any planning permission is granted. The applicant must provide robust evidence, acceptable to the Environment Agency, East Sussex County Council and Wealden District Council’s Building Control Team, demonstrating that during extreme and sustained rainfall events, including those expected to become more frequent and severe as a result of climate change, surface water can be safely contained and managed within the site for a prolonged period without increasing flows into the River Ouse.
There is also a significant concern regarding the long-term management, maintenance and reliability of the proposed Surface Water Management and containment system. It must be demonstrated that appropriate arrangements will be in place to ensure that all components of the system remain fully operational and effective throughout the lifetime of the development, including during extreme rainfall events.
Until these matters have been satisfactorily demonstrated, Friends of Lewes considers that the proposal has not adequately addressed the potential increase in flood risk arising from the Development.
For these reasons, Friends of Lewes object to the application.
Letter sent to Wealden on 14th September.
The Committee examined the following applications and had no observations to make:
SDNP/26/02964/ADV: 16A High Street. 1 vinyl graphic to door, 1 to window, hand painted wall sign and protruding sign.
SDNP/26/03000/HOUS: 6 Fitzroy Road. Loft conversion with rear dormer.
SDNP/26/03056/LDP: 1 Cockshut Road: Single storey rear extension.
SDNP/26/03066/FUL: 1 Cockshut Road. Extending first floor flat to complete first floor area, install air source heat pump and solar panels.
SDNP/26/03161/FUL: 5 Mount Harry Road. Ancillary to Class E(b): storage use strictly subordinate and ancillary to primary restaurant and residential flat above for operators.
SDNP/26/03173/DCOND: Pells Church of England Primary School, Landport Road. Discharge of Condition 21 (SUDS STRATEGY) for SDNP/23/02033CND
SDNP/26/03278/LIS: 22 High Street. Advertisement signage (linked to SDNP/26/03117ADV).
SDNP/26/03297/HOUS: 15 Bradford Road. Single storey rear extension, life-for-like window replacement and roof-mounted solar panels.
6. Flood Report 2026
2026 is likely to be one of the hottest and driest on record, with 4 significant heatwaves impacting most of the UK. As we move into autumn the risk of flooding returns, as rains fall on parched dry ground and run off quickly before they have a chance to soak into soils and underlying strata. Both the 2000 and 1960’s Lewes Floods were in the autumn so let’s hope we don’t see another one in 2026.
The UN have issued advice that this year is likely to see the hottest El Nino for 1000 years develop in the Pacific Ocean. This will release extra heat into the atmosphere, which in turn will bring higher than average rains and risk of flooding in the UK. It is sobering that our government have started to advise us to keep stocks of dried and tinned foods and bottled water in case of extreme weather. It is clearly important that we start to adapt our housing stock and work places to cope with these new extreme summer heatwaves and of course build new homes outside of the floodplain and the higher risks of flooding.
7. Any Other Business:
None
8. Date of Next Meeting:
Wednesday 14th October 2026, at 8.00 p. m., at the Chapter House.
Minutes of a meeting held on Wednesday 5 August 2026, at 8.00 p. m., at the Chapter House, Southover Church.
Present: Will Dorman (in the Chair), John Gower, Luke Bray, Charles Meloy, Julian Till, Andrew Winter and Carolyn Beckingham.
1. Apologies for Absence:
Apologies for absence were received from Alex Durn and Roger Maskew. Will Dorman read a statement from Roger Maskew about the sad passing of his wife Marion
2. Minutes of Previous Meeting:
There was no meeting last month.
3. Executive Committee:
Key items discussed:
(a) High Street – Bronagh Liddicoat updated regarding her representation at two meetings convened by the Mayor who has outlined two priorities for his term of office: affordable housing and the vibrancy of the High Street. Bronagh is part of the sub-group dealing with the High Street following on from her involvement with the 2021 FoL online panel forum. Good non-political representation was provided by retailers, business people and organisations around the town who are suffering badly from increased overheads. A second meeting is to be organised focusing on priorities which include the streetscape as there is a pot of Town Council money that can be used to improve the town. This was very positively received and endorsed by the Executive Committee.
(b) Accounts – FoL’s finances are acceptable with membership rising to 400. The committee questioned the value for money for belonging to the Civic Voice as membership has increased to £600. It was agreed to pay for one more year
(c) North Street Quarter – Peter attended the Lewes District Council Cabinet meeting in Newhaven and questioned the sale of Plot A, which belongs to LDC, to the new Human Nature/Hollybrook partnership. Peter’s three questions will receive a formal answer from the LDC Cabinet. Concern was expressed over the lack of transparency regarding Plot A and Plot B previously bought for £9 million with £2 million being VAT. Serious concerns were also expressed over the building of residential properties on the flood plain and why Springman House isn’t being developed as affordable housing, being outside of the flood area.
(d) Enforcement/Shelleys – Sarah Earl attended the SDNP Planning meeting in Lewes (as Peter was at the Newhaven Cabinet meeting on the same day) and read out the statement regarding the disrepair of Shelleys. Huge thanks to Sarah as her attendance sparked a good quality debate by the Planning Committee which has been uploaded onto the website.
(e) Other properties at risk – Lewes signal box and Fitzroy House.
(f) Tourist Information Office – Peter has written to the Town Clerk regarding the possible transfer of the asset 187 and 188 High Street from LDC to the Town Council asking for an update.
(g) Trees – 28 have been ordered for next season’s planting. The elm on St Anne’s hill has been cut down, but a replacement is planned. The Fouch family has given £1,000 to plant trees at the Pells in memory of Paul Fouch. 2025 and 2026 planted trees are being watered regularly during the extended dry period. John Gower suggested planting more trees in the pedestrian precinct as part of an initiative to celebrate the 75th anniversary of the FoL in 2027 and to help mitigate against the urban heat island effect associated with climate change.
4. Decisions:
The following SDNPA decisions are available online:
SDNP/25/00496/FUL – White Hart Hotel 55 High Street – Demolition of the former hotel annex and construction of 5 new dwellings with parking and associated landscaping. Approved.
5. New Planning Applications:
1 July to 30 July
SDNP/26/02373/HOUS – 18 Eridge Green – Erection of single storey rear extension – Friends of Lewes recommend a condition that roof waters go to soak away, to not overload current drainage/ sewerage systems that are under pressure due to climate change. This will also help alleviate the current pressure on Lewes’s sewerage systems, which has unacceptable discharges of untreated sewage directly to the River Ouse due to insufficient capacity at Ham Lane.
SDNP/26/02388/LIS – 123A Malling Street – Replacement of front door, door frame and threshold. Existing door is rotten and needs replacing: – JG to supply note
SDNP/26/02502/LIS – Sussex Police Hq Malling House Church Lane South Malling – Proposed external repairs to stabilise masonry structure: Friends of Lewes agreed the information supporting this application is incomplete. The drawings are crude and an expert assessment is needed from a specialist stonemason. The Conservation Officer also needs to look at this scheme.
SDNP/26/02547/DCOND – Old Malling Farm Old Malling Way – Discharge condition 27 (Southeast NMU access) in relation to SDNP/18/06103/OUT : Friends of Lewes object to this proposal for the same reasons listed by the Council’s Highways Authority in their objection letter dated 23 July 2026.
SDNP/26/02571/HOUS – 94 Malling Street – Single storey rear extension : Friends of Lewes object to this proposal as, in line with FoL’s policy, new structures should be prevented in flood plains
SDNP/26/02586/HOUS – 16A Landport Road – Single storey side and rear extensions with internal and fenestration alterations: Friends of Lewes object to this proposal as, in line with FoL’s policy, new structures should be prevented in flood plains. FoL also object because there are errors/inconsistencies in the drawings and because the proposed close boarded fence along the front boundary is unsympathetic with the character of the street and sets a bad precedent. The repositioned front entrance is also obstructed by the front forecourt parking
SDNP/26/02629/DCOND – Old Malling Farm Old Malling Way – Discharge of condition 10 (Levels) for SDNP/18/06103/OUT: Friends of Lewes object to this proposal for the same reasons listed by the Council’s Landscape Officer in their objection letter dated 27th July 2026.
SDNP/26/02631/DCOND – Old Malling Farm Old Malling Way – Discharge of condition 6 (Flood risk) and condition 15 (foul drainage) for SDNP/18/06103/OUT: Friends of Lewes object to this proposal for the same reasons listed by the Council’s Flood Risk Management Team in their objection letter dated 22 July 2026.
The Committee examined the following applications and had no observations to make:
SDNP/26/02388/LIS: 123A Malling Street.
Replacement of front door, door frame and threshold. Existing door is rotten and needs replacing
SDNP/26/02578/HOUS: 24 St Anne’s Crescent
Retrospective permission required for the continued use of the annexe as ancillary accommodation, and for external painting of the annexe in a conservation area.
SDNP/26/02594/LDP: 59 The Avenue
11 solar PV panels on roof.
SDNP/26/02613/DCOND: 199 High Street.
Discharge of Conditions 8 (details of extension), 9 (New Dormer) and 12 (new details) for SDNP/25/04946/HOUS.
SDNP/26/02655/LIS: 26 Keere Street
Repainting door and window frames.
SDNP/26/02741: 2 Highdown Road
Loft conversion including hip to gable conversion, new window and rooflight and solar panels on rear roofslope.
SDNP/26/02772/LDP & 02799/LIS: 1 St Michael’s Court, Keere Street
Amalgamation of 2 dwellings into single unit and new internal door.
SDNP/26.02784/LDP 5 Mount Harry Road
Storage Unit.
SDNP/26/02798 DCOND: 199 High Street.
Discharge of Conditions 4 (ARCH 1) and 8 (Details of Extension) for SDNP/25/04946/HOUS.
SDNP/26/02884/DCOND: 199 High Street
Discharge of Condition 7 (Proposed extention) for SDNP/25/04947/LIS.
6. Flood Report:
John Gower reported: There have been no incidents of recent flooding in Lewes. Hardly any rain has fallen and July 2026 is likely to be one of the driest and hottest on record.
Lewes obtains all of its water from the Brighton Chalk Block Aquifer, which is now falling to seasonally low levels, having started the year fully recharged after a wetter-than-average winter. Despite the current low water levels there are no hosepipe bans in Lewes, but it is of course still sensible to conserve water as restrictions could easily be required if the dry weather continues.
Hot summers are often compared to 1976, which had an exceptionally long period of dry, hot, sunny days. This followed a very dry winter in 1975, and by late summer 1976 all of England was suffering a serious drought, with multiple restrictions for water use and people having to queue to get water from standpipes in the street as supplies were cut to many homes. The wet winter of 2025 means we are unlikely to get serious drinking water supply issues this year, but the very hot dry weather will still impact farming with lower than usual harvests and possible localised food shortages.
Climate change is predicted to bring more frequent heatwaves, which are likely to increase maximum temperatures by 1C a decade. This means that the current hottest day of 40C will become 45C by 2070’s, bringing severe problems unless we substantially adapt.
7. Any Other Business:
Carolyn Beckinghamm brought up the issue of potholes, particularly in New Road and Bull Lane. It was decided to refer this to the Executive Committee.
Andrew Winter asked who makes the decision on the names of streets in new developments (Charles Meloy said the developers do, but they inform the Council) as he was concerned that recent street names seem to have little or no connection with Lewes. Will Dorman suggested that this should be referred to the Executive Committee to see whether FoL could be consulted by the Council on future street naming decisions.
8. Date of Next Meeting:
The next meeting is set for the 2nd September but as several members of the Planning Committee will be away then, it was suggested that it would be better to re-organise it for the following week (either the 9th or 10th September). WD to investigate.
A representative of the Friends of Lewes attended the SDNPA Planning committee meeting on the 16th July 2026 and read the following statement.
SDNPA Planning Committee Agenda item 12. Final.
The Friends of Lewes requests an update on the enforcement situation in respect of two prominent listed buildings in the Lewes conservation area.
The first, Shelleys Hotel, a grade II* elegant listed building, dates from 16th century, with 18th century decoration, 17th century panelling and 16th century wall-paintings, closed at the start of the Covid pandemic and has remained empty and unmaintained since. It has now been put on the SAVE ‘buildings at risk’ register.
The adjacent, 136 High Street, an early 19th century, red and brown brick gabled Grade II listed building, has been boarded up since before 2020.
The need for action on both these properties has been being raised with officers since April 2020.
We were told in December 2025 that a section 215 notice had been served in respect of Shelleys Hotel, as it appeared to the authority that the amenity of a part of the town was adversely affected by the condition of a building and land. We have been unable to obtain details of the notice, or the time for compliance, despite repeated requests.Because of the importance of the fabric of the hotel building, and the condition of 136 High Street, we expressed the hope that efforts would continue, through the warrant process, to gain legal access so that their condition could be assessed, and hopefully confirmation received that were watertight with all the historic features protected.
The condition of 136 High Street, the adjacent property, remains unacceptable with boarded up windows and doors. We sought a notice to address these matters. Recently, timber sheeting has been fixed to the top of the side gates to Shelleys Hotel, increasing their height to 3.5m, without the necessary planning permission or listed building consent. Both buildings continue to deteriorate to the detriment of the townscape in this part of the conservation area.
We can find no record on public access portals or the enforcement register of any action by the authority, although more than 6 months has elapsed since the 215 notice was apparently served.
Trees are undermining the foundations of the listed building. Urgent action is necessary. Without any answers to emails we are formally raising these concerns, as the situation undermines the role and effectiveness of the authority. The case featured on the front of Lewes News, the community newspaper distributed to every household in the town, because of the considerable public interest. The authority was asked to provide information but declined.
The continued apparent absence of action is considered entirely unacceptable, and is inconsistent with the very high level of scrutiny by officers of planning applications to alter, paint or repair listed buildings and non-listed buildings in the town.
Minutes of a meeting held on Wednesday 03rd June 2026, at 8.00 pm at the Chapter House, Southover Church.
Present: Roger Maskew, (in the Chair), Luke Bray, Will Dorman, John Gower, Charles Meloy, Julian Till, Andrew Winter and Carolyn Beckingham.
(1) Apologies for Absence:-
An apology for absence was received from Alex Durn.
(2) Minutes of Previous Meeting:-
The minutes of the meeting held on 06th May were approved.
(4) Executive Committee:-
The scheduled meeting of the Executive Committee planned for Wednesday 27th June, was brought forward to Wednesday 20th June at the Climate Hub, due to the Mayor Making Reception on the 27th June.
Key items discussed:-
(a) National Park Local Plan Update: Discussion regarding the publication of a recent press article stating that 685 homes are to be built in Lewes, despite the lack of progress with the major sites still undeveloped, there are major concerns regarding building homes on the flood plain.
(b) It was agreed that following consideration by the Planning Committee of John’s revised Policy for “Development in the Floodplain”, that it would be ratified by the Executive Committee by email, in order to meet the National Park’s consultation deadline of the 23rd June.
(5) Urban Design Group Conference:-
The Committee was reminded that The Urban Design Group Conference in Lewes will be on Friday the 05th June. Roger will be part of the opening presentation in the morning session to be held at the Depot. Two walking tours of Lewes are planned for the afternoon, and both Will and Peter Earl have agreed to be guides.
(6) John Gower’s Presentation:-
The proposed policy on development in the floodplain was discussed, with broad strong agreement for the need and general principles. John Gower will make a minor change to the order of points on page 7, after which it will be sent to Roger Maskew for a final check before being sent to members of the Executive Committee for approval, before 23rd June, which is the deadline for submission of comments on the latest draft of the SDNP Local Plan review. We will include a copy of the policy in our response to the SDNP Local Plan.
7) Planning Decisions from 01/05/2026 to 01/06/2026:-
The following SDNPA decisions are available online:
SDNP/26/00124/FUL: 1 Albion Street. Replacement of 8no. windows to front and side elevations. Refused.
SDNP/26/00437/HOUS: 15 Mount Harry Road. Erection of wooden fencing around the side and front gardens including 2no gates. Refused.
SDNP/25/04982/HOUS: 18 The Meadows. Erection of two storey side extension and creation of 1 no. off-street parking space. Approved.
SDNP/26/01190/HOUS: 9 Cleve Terrace. Loft conversion with rooflight to front. Approved.
SDNP/26/00809/FUL: 20-21 High Street. Partial change of use of ground floor from Class E to form 2no. residential units. Approved.
(8) New Planning Applications from 01/05/2026 to 27/05/2026:-
SDNP/26/01729/PIP: Fuller’ Passage: Erection of up to 3 dwellings.
The Friends of Lewes object to this proposal, as the Society considers it to be an inappropriate form of development, which would result in the overdevelopment of this small town centre site.
In addition, the Society has the following specific concerns:-
(1) It is understood that there is both a land ownership and access issue in relation to Unit 1, both of which would have to be resolved legally, prior to any proposed development being approved.
(2) The juxtaposition of Unit 2 to the existing Vaults development is considered to be unacceptable.
(3) It would appear that the applicant has no control of the overall use of the site, as the use of a number of existing car parking spaces would be lost, which is also considered to be unacceptable.
SDNF/26/02010/LDP: 46 Fitzjohns Road: Conversion of existing attached garage into habitable accommodation to include replacement of existing flat roof with pitched roof:
The Friends of Lewes have no objection in principle to this proposal, but would like to suggest:-
(1) That the proposed side extension is set back slightly from the frontage of the existing house in order to accommodate the change of materials.
(2) That there is no hard standing at the front of the building, which could possibly exacerbate rain water run-off issues.
SDNF/25/01671/FUL: Eastgate Wharf: Demolition of existing buildings and construction of mixed-use development comprising 60 dwellings (Class C3), and 372 sqm ground floor commercial space (Class E), with associated flood defences, landscaping, parking, access alterations, and public realm. (Amended scheme).
The Friends of Lewes object to this proposal for the following reasons:-
(1) The proposed flood defences for this scheme are considered to be unacceptable, as the necessary works to protect the development from flooding would not be totally within the curtilage of the red line, denoting the extent of the proposed scheme.
(2) The area of land immediately fronting the River Ouse, close to Phoenix Causeway, is within the ownership of East Sussex County Council, as Highway Authority. But more significantly, the proposed flood defences, at the new required height, would not extend far enough south to connect with Cliffe Bridge.
(3) In this context, the Society appreciates that this part of the existing flood wall is within another ownership, and is not only in need of repair, but would also have to be increased in height to match the new flood walls, in order to provide sufficient flood protection and to ensure that any future flood water would be prevented from spilling into the proposed development site.
(4) The Society would therefore strongly recommend that this project should not be supported until a commitment to extending the proposed flood defences at the new required height, southwards to connect with Cliffe Bridge, has been agreed with the land owner.
The Committee examined the following applications and had no observations to make:
SDNP/26/01776/PA14A:
14 Barons Walk. Install 11 solar PV panels on flat roof.
SDNP/26/01806/ADV:
The Friars, High Street. Installation of a non-illuminated timber fascia sign with individual letters and a non-illuminated timber blade sign.
SDNP/26/01812/LIS & 01813/FUL
4-6 The Bridge Wharf Brewery, Cliffe High Street. Erection of timber side entrance porch canopy and installation of non-illuminated advertising sign to ground floor side elevation
SDNP/26/01816/HOUS:
21 New Road. Loft conversion and construction of 1no. rear facing dormer and 2no. front facing fooflights.
SDNP/26/01886/PA14OA:
Lewes Golf Club, Chapel Hill. Installation of a solar canopy for renewable energy generation.
SDNP/26/01922/NMA:
Old Malling Farm, Old Malling Way. Non Material Amendment to Condition 3 (Materials) of SDNP/23/04659/REM.
SDNP/26/01942/HOUS & 01943/LIS:
8-9 Chapel Hill. Alterations & refurbishment of existing workshop (resubmission of previous refusal ref: SDNP/25/03602/HOUS).
SDNP/26/01951/NMA:
Knowlands, St Martin’s Lane. Non-material amendments to planning approval SDNP/24/02594/HOUS including timber courtyard doors; removal of chimney stack to east gable; conservation rooflight over entrance to south elevation; 2no. metal chimney flues to north and south pitched roofs; alterations to ground and first floor balcony balustrades.
(9) Flood Report for March 2026: By John Gower.
John Gower has attended 2 online flood events this month. The first supported a PhD Student researching how to set up and maintain successful community flood action groups. 9 representatives of flooded communities took part and a report will be produced on the importance of various factors, such as experience of the group chair, support from local authorities/ water companies/ Environment Agency and communication methods. It was very interesting and heartening to be part of such important research.
The second event was a webinar on flood insurance, organised by the National Flood Forum. It was reported that more and more at-risk properties are being referred to the specialist Flood Re scheme, where the cost of insuring properties in the flood plain has increased by 43% over the last 2 years. It also emerged that insurance companies are compiling their own data bases of flood risk information, and that they do not always use the published data on gov.uk as the basis for deciding risk and pricing premiums.
The recent heatwave set record temperatures for May. The Guardian reported that with Climate Change hotter heatwaves and temperature extremes are expected to become the norm. Although we have seen no flooding from this heatwave, the principles of hotter air holding more moisture leading to more intense rainfalls is very worrying for the future and flood risks.
Research by Avia reports that one in nine new homes are being built in areas at risk of flooding today. It is predicted that 30% of homes built in 2024 will at risk of flooding by 2050, a very worrying thought indeed. This 4 minute video explains the situation and is well worth watching (apologies but there are a couple of adverts included).
(7) Any other business: None.
(8) Date of next meeting: – Wednesday 01st July 2026 at 8.00pm at the Chapter House.